Camshaft Oil Control Valve: Installation: Installation
- INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY
- Install the 2 camshaft timing oil control valves with the 2 bolts.
Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf)
- Connect the 2 connectors.
- Install the 2 camshaft timing oil control valves with the 2 bolts.
- INSTALL INTAKE AIR SURGE TANK . Refer to INSTALLATION - Step 11
- INSTALL AIR CLEANER ASSEMBLY See step 2
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)
- ADD ENGINE COOLANT . Refer to REPLACEMENT - Step 2
- CHECK FOR ENGINE COOLANT LEAKAGE . Refer to REPLACEMENT - Step 3
- INSTALL V-BANK COVER See step 6