LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2011 >> Yaris 4D Hatchback, Standard >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Emission Control System (Service Information) >> PCV Valve >> Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

PCV Valve: Installation: Installation

  1. INSTALL POSITIVE CRANKCASE VENTILATION VALVE (PCV VALVE) 
    Fig 1: Applying Adhesive To Threads Of Bolt
    GTY234111Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. Install the positive crankcase ventilation valve (PCV valve).
      1. Apply adhesive to the end 2 or 3 threads of the bolt.

        Adhesive

        Toyota Genuine Adhesive 1324, Three Bond 1324 or the equivalent.

      2. Install the positive crankcase ventilation valve (PCV valve).
        Fig 2: Locating Positive Crankcase Ventilation Valve
        GTY232998Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

        Torque: 27 N*m (275 kgf*cm, 20 ft.*lbf) 

  2. CONNECT VENTILATION HOSE 
    Fig 3: Locating Ventilation Hose
    GTY233112Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL CYLINDER HEAD COVER NO. 2  . Refer to INSTALLATION - Step 3