LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2012 >> Avalon Base >> Repair and Diagnosis >> Electrical >> Charging Systems >> Charging System (Service Information) >> Generator >> Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Charging System (Service Information): Generator: Installation: Installation

  1. INSTALL GENERATOR ASSEMBLY 
    1. Install the bracket with the bolt.

      Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf) 

    2. Install the wire harness clamp stay.

      Torque: 8.4 N*m (86 kgf*cm, 74 in.*lbf) 

    3. Install the generator assembly with the 2 bolts.

      Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf) 

    4. Install the nut to the cylinder block.

      Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf) 

    5. Connect the generator connector to the generator assembly.
    6. Install the generator wire with the nut.

      Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf) 

    7. Install the terminal cap.
    8. Connect the wire harness clamp.
  2. INSTALL V-RIBBED BELT  . Refer to INSTALLATION - Step 1 .
  3. INSTALL V-BANK COVER SUB-ASSEMBLY  . Refer to INSTALLATION - Step 14 .
  4. CONNECT BATTERY NEGATIVE TERMINAL 
  5. PERFORM INITIALIZATION 

    HINT: 

    Refer to INITIALIZATION .

    1. Some systems need initialization when disconnecting the battery terminal.