Transmission Control Cable: Installation: Installation
- INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
- Install the transmission control cable assembly with the 2 nuts.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Torque: 5.0 N*m (1 kgf*cm, 44 in.*lbf)
- Install the transmission control cable assembly with the nut.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Torque: 5.0 N*m (1 kgf*cm, 44 in.*lbf)
- Install the 2 transmission control cables to the control cable bracket with 2 new clips *1.
- Install the 2 transmission control cables to the transaxle with the 2 clips *2.
- Rotate the transmission control cable nut counterclockwise approximately 180° and, while holding the nut in that position, press in the stopper until it makes 2 "click" sounds.
- Install the outer part of the transmission control cable to the shift lever retainer, check that the position of the spring is the same as A shown in the illustration, and push in the stopper.
HINT:
If the stopper cannot be pushed in, slightly rotate the nut clockwise and then push in the stopper.
- Push the two claws together at the top of the transmission control cable lock piece. While holding the two claws together, push the two lugs on the bottom of the lock piece toward each other and upward to pull out the lock piece.
- Install the control shift cable to the shift lever assembly.
- Install the control select cable to the shift lever assembly.NOTE:
- Make sure to adjust the length at the neutral shift position.
- Make sure that the lock piece is protruding from the adjuster case.
- Press in and lock the lock piece to the adjuster case.NOTE:
Securely press in the lock piece until the lock engages.
- Install the transmission control cable assembly with the 2 nuts.
- ADJUST TRANSMISSION CONTROL SELECT CABLE See step 1
- INSTALL LOWER CENTER INSTRUMENT PANEL FINISH PANEL . Refer to INSTALLATION - Step 15
- INSTALL FRONT NO. 1 CONSOLE BOX INSERT . Refer to INSTALLATION - Step 17
- INSTALL FRONT NO. 2 CONSOLE BOX INSERT . Refer to INSTALLATION - Step 18
- INSTALL FRONT CONSOLE BOX ASSEMBLY . Refer to INSTALLATION - Step 1
- INSTALL CONSOLE BOX CARPET
- INSTALL NO. 2 SWITCH HOLE BASE . Refer to INSTALLATION - Step 22
- INSTALL FRONT UPPER CONSOLE BOX . Refer to INSTALLATION - Step 23
- INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY . Refer to INSTALLATION - Step 5
- INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY . Refer to INSTALLATION - Step 7
- INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY . Refer to INSTALLATION - Step 17
- INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR
- Install the No. 1 front floor heat insulator with the 3 nuts.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Torque: 5.5 N*m (6 kgf*cm, 49 in.*lbf)
- Install the No. 1 front floor heat insulator with the 3 nuts.
- INSTALL FRONT EXHAUST PIPE ASSEMBLY . Refer to INSTALLATION - Step 4
- INSTALL AIR CLEANER CASE . Refer to INSTALLATION - Step 62
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY . Refer to INSTALLATION - Step 2
- INSTALL BATTERY CARRIER . Refer to INSTALLATION - Step 60
- INSTALL BATTERY TRAY
- INSTALL BATTERY . Refer to INSTALLATION - Step 61
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- INSPECT FOR EXHAUST GAS LEAK
- INSTALL NO. 2 CYLINDER HEAD COVER . Refer to INSTALLATION - Step 85