Section 18 (Emission Control System (2ZR-FE) (Service Information)): Canister: Installation: Installation
WARNING: This page is about a different variant/trim than selected.
- INSTALL CHARCOAL CANISTER ASSEMBLY
- Install the 3 bolts and charcoal canister assembly.
Torque: 19 N*m (194 kgf*cm, 14 ft.*lbf)
- Connect the charcoal canister filter sub-assembly and 2 clamps to the charcoal canister assembly.
- Connect the purge line hose.
- Connect the wire harness clamp.
- Connect the vapor pressure sensor connector.
- Connect the fuel tank vent hose to the charcoal canister.
- Install the 3 bolts and charcoal canister assembly.