ECM Power Source Circuit: Procedure
- INSPECT INTEGRATION RELAY (POWER SOURCE)
- Remove the integration relay from the engine room relay block.
- Disconnect the integration relay connector.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition 1E-1 - Body ground Always 11 to 14 V - Reconnect the integration relay connector.
- Reinstall the integration relay.
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY - BATTERY)
OK: Go to next step
- INSPECT FUSES (EFI MAIN, IG2, AND EFI NO. 1 FUSES)
- Remove the EFI MAIN fuse, IG2 fuse and EFI No. 1 fuse from the engine room relay block.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition EFI MAIN fuse Always Below 1 Ω IG2 fuse EFI No. 1 fuse - Reinstall the fuses.
NG → REPLACE FUSE (EFI MAIN, IG2 OR EFI NO. 1 FUSE)
OK: Go to next step
- INSPECT INTEGRATION RELAY (EFI MAIN RELAY AND IG2 RELAY)
- Inspect the integration relay. Refer to INSPECTION .
NG → See step 13
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - ECM)
- Remove the integration relay from the engine room relay block.
- Disconnect the integration relay connector.
- Disconnect the ECM connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance (Check for Open)
Tester Connection Condition Specified Condition A37-44 (MREL) - 1B-2 Always Below 1 Ω A37-2 (+B) - 1B-4 Always Below 1 Ω A37-1 (+B2) - 1B-4 Always Below 1 Ω Standard Resistance (Check for Short)
Tester Connection Condition Specified Condition A37-44 (MREL) or 1B-2 - Body ground Always 10 kΩ or higher - Reconnect the integration relay connector.
- Reinstall the integration relay.
- Reconnect the ECM connector.
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY - ECM)
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - BODY GROUND)
- Remove the integration relay from the engine room relay block.
- Disconnect the integration relay connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance (Check for Open)
Tester Connection Condition Specified Condition 1A-3 - Body ground Always Below 1 Ω 1B-3 - Body ground Always Below 1 Ω - Reconnect the integration relay connector.
- Reinstall the integration relay.
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY - BODY GROUND)
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
- Disconnect the ECM connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance (Check for Open)
Tester Connection Condition Specified Condition B29-104 (E1) - Body ground Always Below 1 Ω - Reconnect the ECM connector.
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - BODY GROUND)
OK: Go to next step
- INSPECT ECM (IGSW TERMINAL VOLTAGE)
- Disconnect the ECM connectors.
- Turn the ignition switch to ON.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Switch Condition Specified Condition A37-28 (IGSW) - B29-104 (E1) Ignition switch ON 11 to 14 V - Reconnect the ECM connectors.
NG → See step 8
OK → See step 14
- INSPECT FUSE (IGN FUSE)
- Remove the IGN fuse from the driver side junction block.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition IGN fuse Always Below 1 Ω - Reinstall the IGN fuse.
NG → REPLACE FUSE (IGN FUSE)
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (ECM - INTEGRATION RELAY)
- Remove the integration relay from the engine room relay block.
- Disconnect the integration relay connector.
- Disconnect the ECM connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance (Check for Open)
Tester Connection Condition Specified Condition A37-28 (IGSW) - 1A-4 Always Below 1 Ω - Reconnect the integration relay connector.
- Reinstall the integration relay.
- Reconnect the ECM connector.
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - INTEGRATION RELAY)
OK: Go to next step
- INSPECT FUSE (IG2 NO. 2 FUSE)
- Remove the IG2 No. 2 fuse from the engine room relay block.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition IG2 No. 2 fuse Always Below 1 Ω - Reinstall the fuse.
NG → REPLACE FUSE (IG2 NO. 2 FUSE)
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (INTEGRATION RELAY - IGNITION SWITCH)
- Remove the integration relay from the engine room relay block.
- Disconnect the integration relay connector.
- Disconnect the ignition switch connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance (Check for Open)
Tester Connection Condition Specified Condition 1A-2 - E5-6 (IG2) Always Below 1 Ω - Reconnect the integration relay connector.
- Reinstall the integration relay.
- Reconnect the ignition switch connector.
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR (INTEGRATION RELAY - IGNITION SWITCH)
OK: Go to next step
- INSPECT IGNITION SWITCH
- Inspect the ignition switch. Refer to INSPECTION .
NG → See step 15
OK → REPAIR OR REPLACE HARNESS OR CONNECTOR (IGNITION SWITCH - BATTERY)
- REPLACE INTEGRATION RELAY. Refer to REMOVAL.
- REPLACE ECM. Refer to REMOVAL
- REPLACE IGNITION SWITCH. Refer to REMOVAL