Intake Manifold: Installation: Installation
WARNING: This page is about a different variant/trim than selected.
- INSTALL INTAKE MANIFOLD
- Install a new No. 1 intake manifold to head gasket to the intake manifold.
- Install the intake manifold with the 2 bolts and 2 nuts.
Torque: 28 N*m (286 kgf*cm, 21 ft.*lbf)
- Connect the fuel vapor feed hose and ventilation hose.
- Install a new O-ring to the engine oil level dipstick guide sub-assembly.
- Apply a light coat of engine oil to the O-ring.
- Install the engine oil level dipstick guide sub-assembly with the 2 bolts and connect the wire harness clamp.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Bolt (A)
Torque: 28 N*m (286 kgf*cm, 21 ft.*lbf)
Bolt (B)
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Install the engine oil level dipstick.
- Connect the 2 wire harness clamps and 3 connectors.
- INSTALL PURGE VSV . Refer to INSTALLATION - Step 1
- INSTALL MANIFOLD ABSOLUTE PRESSURE SENSOR . Refer to INSTALLATION - Step 1
- INSTALL EGR PIPE ASSEMBLY . Refer to INSTALLATION - Step 3
- INSTALL THROTTLE BODY ASSEMBLY
Refer to INSTALLATION