LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2013 >> Prius Five >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (Hybrid Battery Control System (Service Information) (Plug-In)) >> Charge Inlet >> Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Charge Inlet: Installation: Installation

WARNING: This page is about a different variant/trim than selected.
  1. INSTALL ELECTRIC VEHICLE CHARGER WIRE 
    WARNING:

    Wear insulated gloves.

    1. Install the wire harness with the nut.

      Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf) 

    2. Connect the connector.
    3. Connect the 3 clamps.
    4. Connect the 2 clamps.
    5. Connect the 2 clamps.
    6. Connect the 2 connectors and slide the 2 green-colored locks in the direction indicated by the arrow in the illustration to lock them securely.
      Fig 1: Connecting Connectors
      GTY333574Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      TEXT IN ILLUSTRATION

      *a Green-colored Lock
      NOTE:

      Make sure that the connectors are connected securely.

    7. Connect the clamp.
    8. Connect the 2 connectors.
  2. INSTALL NO. 2 HYBRID VEHICLE BATTERY SHIELD PANEL  See step  10
  3. INSTALL BATTERY CHARGER CONNECTOR OPENING LID SUB-ASSEMBLY 
    1. Install the battery charger connector opening lid sub-assembly with the 4 nuts.

      Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf) 

    2. Connect the 2 connectors.
  4. INSTALL ELECTRIC VEHICLE CHARGER CABLE 
    WARNING:

    Wear insulated gloves.

    1. Install the electric vehicle charger cable with 4 new bolts.

      Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf) 

      NOTE:
      • Do not reuse the 4 electric vehicle charger cable bolts.
      • Do not drop the electric vehicle charger cable.
      • Do not reuse the electric vehicle charger cable if it has been dropped.
    2. Connect the clamp.
    3. Connect the connector and slide the green-colored lock in the direction indicated by the arrow in the illustration to lock it securely.
      Fig 2: Connecting Connector
      GTY343489Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      TEXT IN ILLUSTRATION

      *a Green-colored Lock
      NOTE:

      Make sure that the connector is connected securely.

    4. Connect the clamp and 2 connectors.
    5. Install the wire harness with the bolt.

      Torque: 6.0 N*m (61 kgf*cm, 53 in.*lbf) 

    6. Connect the clamp and connector.
    7. Connect the hose.
      NOTE:

      Make sure that the hose is connected securely.

  5. INSTALL DECK TRIM SIDE PANEL ASSEMBLY RH  . Refer to INSTALLATION - Step 18
  6. INSTALL TONNEAU COVER HOLDER CAP (for RH Side) 

    HINT: 

    Use the same procedure described for the LH side. Refer to INSTALLATION - Step 15 .

  7. INSTALL LUGGAGE HOLD BELT STRIKER ASSEMBLY (for RH Side) 

    HINT: 

    Use the same procedure described for the LH side. Refer to INSTALLATION - Step 16 .

  8. INSTALL REAR SIDE SEAT BACK ASSEMBLY RH  . Refer to INSTALLATION - Step 5
  9. INSTALL REAR SEAT CUSHION ASSEMBLY  . Refer to INSTALLATION - Step 7
  10. INSTALL REAR DOOR OPENING TRIM WEATHERSTRIP RH  . Refer to INSTALLATION - Step 47
  11. INSTALL REAR DOOR SCUFF PLATE RH 

    HINT: 

    Use the same procedure described for the LH side. Refer to INSTALLATION - Step 38 .

  12. INSTALL REAR DECK TRIM COVER  . Refer to INSTALLATION - Step 21
  13. INSTALL DECK TRIM SERVICE HOLE COVER  . Refer to INSTALLATION - Step 22
  14. INSTALL REAR NO. 1 FLOOR BOARD  . Refer to INSTALLATION - Step 23
  15. INSTALL REAR NO. 1 FLOOR BOARD SUB-ASSEMBLY  . Refer to INSTALLATION - Step 24
  16. INSTALL REAR NO. 2 FLOOR BOARD SUB-ASSEMBLY  . Refer to INSTALLATION - Step 25
  17. INSTALL TONNEAU COVER ASSEMBLY (w/ Tonneau Cover)  . Refer to INSTALLATION - Step 28
  18. INSTALL DECK FLOOR BOX LH 

    HINT: 

    Use the same procedure described for the RH side. Refer to INSTALLATION - Step 54 .

  19. INSTALL REAR NO. 4 FLOOR BOARD SUB-ASSEMBLY  . Refer to INSTALLATION - Step 27
  20. INSTALL REAR NO. 2 FLOOR BOARD  . Refer to INSTALLATION - Step 56
  21. INSTALL SERVICE PLUG GRIP 

    Refer to INSTALLATION