HV Battery Stack: Installation: Installation
- INSTALL NO. 4 HYBRID VEHICLE SUPPLY STACK SUB-ASSEMBLY WARNING:
Be sure to wear insulated gloves and protective goggles.
NOTE:Before installing a new hybrid vehicle supply stack sub-assembly, the voltage should be adjusted to the appropriate value.
- Install the No. 4 hybrid vehicle supply stack sub-assembly with the 4 nuts.
Torque: 19 N*m (194 kgf*cm, 14 ft.*lbf)
- Install the No. 2 hybrid vehicle battery shield reinforcement with the 3 bolts.
Torque: 11 N*m (112 kgf*cm, 8 ft.*lbf)
HINT:
Install the center bolt first.
- Install the No. 1 hybrid vehicle battery shield reinforcement with the 3 bolts.
Torque: 11 N*m (112 kgf*cm, 8 ft.*lbf)
HINT:
Install the center bolt first.
- Install the No. 1 hybrid battery exhaust duct and No. 2 hybrid battery exhaust duct with the 8 claws.
- Install the No. 5 hybrid battery intake duct with the 4 claws.
- Using an insulated tool, Install the No. 3 hybrid vehicle battery pack cable with a new bolt.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
NOTE:- The terminal cover should be connected securely.
- Make sure to connect the No. 3 hybrid vehicle battery pack cable securely. If the power switch is turned on (READY) without the No. 3 hybrid vehicle battery pack cable connected, the inner circuit of the battery smart unit will be damaged due to high voltage supplied through the battery block voltage detection circuit.
- Using an insulated tool, connect the No. 2 hybrid vehicle battery pack cable with a new bolt.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
NOTE:The terminal cover should be connected securely.
- Install the No. 4 hybrid vehicle supply stack sub-assembly with the 4 nuts.
- INSTALL NO. 3 HYBRID VEHICLE SUPPLY STACK SUB-ASSEMBLY WARNING:
Be sure to wear insulated gloves and protective goggles.
NOTE:Before installing a new hybrid vehicle supply stack sub-assembly, the voltage should be adjusted to the appropriate value.
- Install the No. 3 hybrid vehicle supply stack sub-assembly with the 4 nuts.
Torque: 19 N*m (194 kgf*cm, 14 ft.*lbf)
- Install the 2 No. 2 hybrid vehicle battery shield reinforcements with the 6 bolts.
Torque: 11 N*m (112 kgf*cm, 8 ft.*lbf)
HINT:
Install the center bolt first.
- Install the No. 1 hybrid battery exhaust duct and No. 2 hybrid battery exhaust duct with the 8 claws.
- Install the No. 5 hybrid battery exhaust duct and No. 6 hybrid battery exhaust duct with the 8 claws.
- Using an insulated tool, connect the No. 3 hybrid vehicle battery pack cable with a new bolt.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
NOTE:- The terminal cover should be connected securely.
- Make sure to connect the No. 3 hybrid vehicle battery pack cable securely. If the power switch is turned on (READY) without the No. 3 hybrid vehicle battery pack cable connected, the inner circuit of the battery smart unit will be damaged due to high voltage supplied through the battery block voltage detection circuit.
- Install the hybrid battery terminal block with the 2 claws.
- Using an insulated tool, install the No. 6 hybrid vehicle battery terminal with the nut.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
NOTE:The terminal cover should be connected securely.
- Install the electric vehicle battery plug assembly and No. 1 hybrid vehicle battery rear shield bracket with the 3 nuts.
Torque: 10 N*m (105 kgf*cm, 8 ft.*lbf)
- Connect the connector to the electric vehicle battery plug assembly.
- Using an insulated tool, connect the electric vehicle battery plug assembly with a new nut.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
NOTE:The terminal cover should be connected securely.
- Using an insulated tool, install the new electric vehicle fuse with the 2 new bolts.
Torque: 6.2 N*m (63 kgf*cm, 55 in.*lbf)
- Connect the fuse block (for No. 3 hybrid vehicle supply stack sub-assembly) to the No. 2 hybrid vehicle supply stack sub-assembly. (w/ fuse block)
- Install the No. 3 hybrid vehicle supply stack sub-assembly with the 4 nuts.
- INSTALL NO. 2 HYBRID VEHICLE SUPPLY STACK SUB-ASSEMBLY WARNING:
Be sure to wear insulated gloves and protective goggles.
NOTE:Before installing a new hybrid vehicle supply stack sub-assembly, the voltage should be adjusted to the appropriate value.
- Install the No. 2 hybrid vehicle supply stack sub-assembly with the 4 nuts.
Torque: 19 N*m (194 kgf*cm, 14 ft.*lbf)
- Install the 2 No. 2 hybrid vehicle battery shield reinforcements with the 6 bolts.
Torque: 11 N*m (112 kgf*cm, 8 ft.*lbf)
HINT:
Install the center bolt first.
- Install the No. 1 hybrid battery exhaust duct and No. 2 hybrid battery exhaust duct with the 8 claws.
- Install the No. 5 hybrid battery exhaust duct and No. 6 hybrid battery exhaust duct with the 8 claws.
- Using an insulated tool, connect the No. 3 hybrid vehicle battery pack cable with a new bolt.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
NOTE:- The terminal cover should be connected securely.
- Make sure to connect the No. 3 hybrid vehicle battery pack cable securely. If the power switch is turned on (READY) without the No. 3 hybrid vehicle battery pack cable connected, the inner circuit of the battery smart unit will be damaged due to high voltage supplied through the battery block voltage detection circuit.
- Using an insulated tool, connect the electric vehicle battery plug assembly with a new nut.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
NOTE:The terminal cover should be connected securely.
- Connect the fuse block (for No. 3 hybrid vehicle supply stack sub-assembly) to the No. 2 hybrid vehicle supply stack sub-assembly. (w/ fuse block)
- Install the No. 2 hybrid vehicle supply stack sub-assembly with the 4 nuts.
- INSTALL NO. 1 HYBRID VEHICLE SUPPLY STACK SUB-ASSEMBLY WARNING:
Be sure to wear insulated gloves and protective goggles.
NOTE:Before installing a new hybrid vehicle supply stack sub-assembly, the voltage should be adjusted to the appropriate value.
- Install the No. 1 hybrid vehicle supply stack sub-assembly with the 4 nuts.
Torque: 19 N*m (194 kgf*cm, 14 ft.*lbf)
- Install the No. 2 hybrid vehicle battery shield reinforcement with the 3 bolts.
Torque: 11 N*m (112 kgf*cm, 8 ft.*lbf)
HINT:
Install the center bolt first.
- Install the No. 1 hybrid vehicle battery shield reinforcement with the 3 bolts.
Torque: 11 N*m (112 kgf*cm, 8 ft.*lbf)
HINT:
Install the center bolt first.
- Install the No. 1 hybrid battery exhaust duct and No. 2 hybrid battery exhaust duct with the 8 claws.
- Install the No. 5 hybrid battery exhaust duct with the 4 claws.
- Using an insulated tool, connect the No. 3 hybrid vehicle battery pack cable with a new bolt.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
NOTE:- The terminal cover should be connected securely.
- Make sure to connect the No. 3 hybrid vehicle battery pack cable securely. If the power switch is turned on (READY) without the No. 3 hybrid vehicle battery pack cable connected, the inner circuit of the battery smart unit will be damaged due to high voltage supplied through the battery block voltage detection circuit.
- Using an insulated tool, connect the No. 1 hybrid vehicle battery pack cable with a new bolt.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
NOTE:The terminal cover should be connected securely.
- Install the No. 1 hybrid vehicle supply stack sub-assembly with the 4 nuts.
- INSTALL NO. 1 HYBRID VEHICLE BATTERY HOSE WARNING:
Be sure to wear insulated gloves and protective goggles.
- Install the No. 1 hybrid vehicle battery hose with the 8 clips.
- INSTALL NO. 2 HYBRID VEHICLE BATTERY HOSE WARNING:
Be sure to wear insulated gloves and protective goggles.
- Install the No. 2 hybrid vehicle battery hose with the 2 clips.
- INSTALL NO. 3 HYBRID BATTERY INTAKE DUCT
- Install the No. 3 hybrid battery intake duct with the 2 clips.
- Connect the 2 intake air temperature sensor and 4 clamps.
- INSTALL NO. 4 HYBRID BATTERY INTAKE DUCT
- Install the No. 4 hybrid battery intake duct. (w/ fuse block)
- Install the No. 4 hybrid battery intake duct with the 2 clips.
- Connect the 2 intake air temperature sensor and 4 clamps.
- Install the No. 4 hybrid battery intake duct. (w/o fuse block)
- Install the No. 4 hybrid battery intake duct with the 2 clips.
- Connect the 2 intake air temperature sensor and 3 clamps.
- Install the No. 4 hybrid battery intake duct. (w/ fuse block)
- INSTALL NO. 2 HYBRID BATTERY INTAKE DUCT See step 7
- INSTALL NO. 1 HYBRID BATTERY INTAKE DUCT See step 8
- INSTALL BATTERY SMART UNIT See step 1
- INSTALL HYBRID BATTERY JUNCTION BLOCK ASSEMBLY
Refer to INSTALLATION
- PERFORM UTILITY NOTE:
Make sure to perform "Battery Status Info Update" if the hybrid vehicle supply stack sub-assembly or HV battery is replaced. Refer to UTILITY .