Installation [10/2013 - ]
WARNING: This page is about a different variant/trim than selected.
- INSTALL POWER MANAGEMENT CONTROL ECU
- Engage the 2 claws to install the power management control ECU.
- INSTALL ECU INTEGRATION BOX
- Install the ECU integration box with the 2 nuts and bolt.
Nut
Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf)
Bolt
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- Engage the 3 clamps to connect the wire harness.
- Connect each connector.
- Install the ECU integration box with the 2 nuts and bolt.
- INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY . Refer to INSTALLATION [10/2013 - ] - Step 12
- INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY . Refer to INSTALLATION [10/2013 - ] - Step 13
- CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Refer to INITIALIZATION [10/2013 - ] .
- INSTALL DECK FLOOR BOX RH . Refer to INSTALLATION [10/2013 - ] - Step 54
- INSTALL REAR NO. 3 FLOOR BOARD . Refer to INSTALLATION [10/2013 - ] - Step 55
- INSTALL REAR NO. 2 FLOOR BOARD . Refer to INSTALLATION [10/2013 - ] - Step 56