Pattern Select Switch Power Mode Circuit [10/2013 - ]: Procedure
- READ VALUE USING TECHSTREAM (CAN BUS CHECK) See step 2
B → See step 10
A: Go to next step
- CHECK DTC OUTPUT (HEALTH CHECK) See step 3
B → GO TO DTC CHART
A: Go to next step
- PERFORM ACTIVE TEST USING TECHSTREAM (COMBINATION METER)
- Connect the Techstream to the DLC3.
- Turn the power switch on (IG).
- Enter the following menus: Body Electrical / Combination Meter / Active Test / Indicat. Lamp ECT PWR.
- Perform the "Indicat. Lamp ECT PWR" Active Test.OK
Tester Display Description Inspection Condition Specified Condition Indicat. Lamp ECT PWR Pattern select indicator light (PWR) POWER mode Comes on Result
Result Proceed to The POWER mode indicator light comes on A The POWER mode indicator light does not come on B
B → See step 11
A: Go to next step
- READ VALUE USING TECHSTREAM (PATTERN SWITCH (PWR/M))
- Connect the Techstream to the DLC3.
- Turn the power switch on (IG).
- Enter the following menus: Powertrain / Hybrid Control / Data List / Pattern Switch (PWR/M).
- Read the value displayed on the Techstream.
Tester Display Measurement Item/Range Normal Condition Diagnostic Note Pattern Switch (PWR/M) POWER mode switch condition/
ON or OFFPOWER mode switch ON:
ON
POWER mode switch OFF:
OFF- Result
Result Proceed to The Techstream display changes according to the POWER mode switch operation. A The Techstream display does not changes according to the POWER mode switch operation. B
B → See step 5
A → See step 9
- INSPECT INTEGRATION CONTROL AND PANEL SUB-ASSEMBLY (POWER MODE SWITCH)
- Remove the integration control and panel sub-assembly (POWER MODE switch).
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition L78-7 (PWR) - L78-5 (E) POWER MODE Switch ON Below 1 Ω L78-7 (PWR) - L78-5 (E) POWER MODE Switch OFF 10 kΩ or higher TEXT IN ILLUSTRATION*1 Component without harness connected
(Integration Control and Panel Sub-assembly (POWER MODE Switch)) - Install the integration control and panel sub-assembly.
NG → See step 8
OK: Go to next step
- Remove the integration control and panel sub-assembly (POWER MODE switch).
- CHECK HARNESS AND CONNECTOR (POWER MODE SWITCH - BODY GROUND)
- Disconnect connector L78 from the integration control and panel sub-assembly (POWER MODE switch).
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition L78-5 (E) - Body ground Always Below 1 Ω TEXT IN ILLUSTRATION*1 Front view of wire harness connector
(to Integration Control and Panel Sub-assembly (POWER MODE Switch)) - Connect the integration control and panel sub-assembly connector.
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (POWER MODE SWITCH - ECM)
- Disconnect connector L78 from the integration control and panel sub-assembly (POWER MODE switch).
- Disconnect connector A57 from the ECM.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition L78-7 (PWR) - A57-46 (PWMS) Always Below 1 Ω L78-7 (PWR) or A57-46 (PWMS) - Body ground Always 10 kΩ or higher TEXT IN ILLUSTRATION*1 Front view of wire harness connector
(to Integration Control and Panel Sub-assembly (POWER MODE Switch))*2 Front view of wire harness connector
(to ECM) - Connect the integration control and panel sub-assembly connector.
- Connect the ECM connector.
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR
OK → See step 12
- REPLACE INTEGRATION CONTROL AND PANEL SUB-ASSEMBLY. Refer to COMPONENTS [10/2013 - ]
- CHECK FOR INTERMITTENT PROBLEMS. Refer to CHECK FOR INTERMITTENT PROBLEMS [10/2013 - ]
- GO TO CAN COMMUNICATION SYSTEM. Refer to HOW TO PROCEED WITH TROUBLESHOOTING [10/2013 - ]
- CHECK METER / GAUGE SYSTEM. Refer to PROBLEM SYMPTOMS TABLE [10/2013 - ]
- REPLACE ECM. Refer to COMPONENTS [10/2013 - ]