Monitor Strategy
| Related DTCs | P2822: Pressure Control Solenoid (Shift solenoid valve SLP) / Range check |
| Required sensors/Components | Continuously variable transaxle assembly (Shift solenoid valve SLP) |
| Frequency of operation | Continuous |
| Duration Conditions | 1.049 seconds |
| MIL operation | Immediately |
| Sequence of operation | None |