Installation [10/2019 - ]: Procedure
- INSTALL NO. 1 CONVERTER CONTROL BRACKET
- Install the No. 1 converter control bracket to the eco-run vehicle converter assembly with the 2 bolts.
Torque: 7.0 N.m (71 kgf/cm, 62 in.lbf)
- Install the No. 1 converter control bracket to the eco-run vehicle converter assembly with the 2 bolts.
- INSTALL ECO-RUN VEHICLE CONVERTER ASSEMBLY
- INSTALL FRONT BUMPER ASSEMBLY
- for Off Road Package:
Refer to INSTALLATION [02/2019 - 08/2020] , or refer to INSTALLATION [08/2020 - 12/2021] , or refer to INSTALLATION [12/2021 - ]
- except Off Road Package:
Refer to INSTALLATION [02/2019 - 08/2020] , or refer to INSTALLATION [08/2020 - 12/2021] , or refer to INSTALLATION [12/2021 - ]
- for Off Road Package:
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [10/2019 - 06/2020] , or refer to INITIALIZATION [06/2020 - 08/2020] , or refer to INITIALIZATION [08/2020 - 12/2021] , or refer to INITIALIZATION [12/2021 - 10/2022] , or refer to INITIALIZATION [10/2022 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]