Installation [06/2016 - ]: Procedure
- INSTALL ECM BRACKET
- Engage the 2 claws to install a new ECM bracket to the ECM.NOTE:
- After attaching the ECM bracket to the ECM, do not remove the ECM bracket.
- If the ECM bracket is attached to the ECM in the incorrect direction, replace the ECM bracket with a new one.
- Engage the 2 claws to install a new ECM bracket to the ECM.
- INSTALL ECM NOTE:
When replacing the ECM, do not use ECM with different specifications.
- Install the ECM with the 2 nuts.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Connect the 4 connectors to the ECM.NOTE:
Be sure to securely connect the connectors.
- Install the ECM with the 2 nuts.
- INSTALL CONTROL UNIT RELAY ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY
Refer to PROCEDURE - Step 3 [06/2016 - 03/2017] , or refer to PROCEDURE - Step 3 [03/2017 - ]
- INSTALL INSTRUMENT SIDE PANEL RH
Refer to PROCEDURE - Step 7 [06/2016 - 03/2017] , or refer to PROCEDURE - Step 7 [03/2017 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 6.0 N*m (61 kgf*cm, 53 in.*lbf)
- PERFORM INITIALIZATION
See step 6