Installation [11/2015 - ]: Procedure
- INSTALL NO. 2 ECM BRACKET
- Install the No. 2 ECM bracket to the ECM with the 2 screws.
Torque: 4.5 N.m (46 kgf.cm, 40 in./lbf)
- Install the No. 2 ECM bracket to the ECM with the 2 screws.
- INSTALL NO. 1 ECM BRACKET
- Install the No. 1 ECM bracket to the ECM with the 2 screws.
Torque: 4.5 N.m (46 kgf.cm, 40 in./lbf)
- Install the No. 1 ECM bracket to the ECM with the 2 screws.
- INSTALL ECM
- Install the ECM with the bolt and nut.
Bolt
Torque: 13 N.m (133 kgf.cm, 10 ft./lbf)
Nut
Torque: 8.0 N.m (82 kgf.cm, 71 in./lbf)
NOTE:If the ECM has been struck or dropped, replace it.
- Install the engine wire to the No. 1 ECM bracket with the bolt.
Torque: 8.0 N.m (82 kgf.cm, 71 in./lbf)
- Engage the 2 clamps.
- Connect the 2 ECM connectors and lower the 2 levers.NOTE:
- When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water or other foreign matter.
- Be sure to securely connect the ECM connectors.
- Install the ECM with the bolt and nut.
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Refer to PROCEDURE - Step 2 [11/2015 - 12/2018] , or refer to PROCEDURE - Step 2 [12/2018 - ]
- PERFORM INITIALIZATION
Refer to INITIALIZATION [11/2015 - 11/2017] , or refer to INITIALIZATION [11/2017 - 12/2018] , or refer to INITIALIZATION [12/2018 - 08/2019] , or refer to INITIALIZATION [08/2019 - 07/2020] , or refer to INITIALIZATION [07/2020 - ]