Installation [11/2017 - 09/2019]: Procedure
- INSTALL NO. 2 ECM BRACKET
- Install the No. 2 ECM bracket to the ECM with the 2 screws.
Torque: 3.2 N*m (33 kgf*cm, 28 in.*lbf)
- Install the No. 2 ECM bracket to the ECM with the 2 screws.
- INSTALL ECM BRACKET
- Install the ECM bracket to the ECM with the 2 screws.
Torque: 3.2 N*m (33 kgf*cm, 28 in.*lbf)
- Install the ECM bracket to the ECM with the 2 screws.
- INSTALL ECM
- Install the ECM to the instrument panel reinforcement assembly with the 2 bolts and nut.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Connect the 6 connectors.
- Engage the clamp to install the wire harness.
- Install the ECM to the instrument panel reinforcement assembly with the 2 bolts and nut.
- INSTALL LOWER INSTRUMENT PANEL ASSEMBLY
Refer to PROCEDURE - Step 4
- INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL GLOVE COMPARTMENT PLATE
Refer to PROCEDURE - Step 6
- INSTALL INSTRUMENT SIDE PANEL RH
Refer to PROCEDURE - Step 7
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
NOTE:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [11/2017 - 09/2019]
- PERFORM SRS WARNING LIGHT
(Refer to DIAGNOSIS SYSTEM [08/2015 - 09/2019] )
- PERFORM INITIALIZATION
Refer to INITIALIZATION [11/2017 - 09/2019]