LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2021 >> C-HR LE >> Repair and Diagnosis >> Engine Performance >> Remove, Overhaul & Install >> Engine Control System - Service Information >> ECM >> Installation [02/2017 - 08/2020] >> Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation [02/2017 - 08/2020]: Procedure

  1. INSTALL NO. 2 ECM BRACKET 
    1. Install the No. 2 ECM bracket to the ECM with the 2 screws.

      Torque: 4.5 N*m (46 kgf*cm, 40 in.*lbf) 

  2. INSTALL NO. 1 ECM BRACKET 
    1. Install the No. 1 ECM bracket to the ECM with the 2 screws.

      Torque: 4.5 N*m (46 kgf*cm, 40 in.*lbf) 

  3. INSTALL ECM 
    1. Install the ECM with the bolt and nut.

      Bolt 

      Torque: 12.5 N*m (127 kgf*cm, 9 ft.*lbf) 

      Nut 

      Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf) 

      NOTE:

      If the ECM has been struck or dropped, replace it.

    2. Engage the 2 claws to connect the engine wire to the No. 1 engine room relay block.
    3. Connect the 3 connectors to the engine room relay block assembly.
    4. Install the No. 1 relay block cover to the No. 1 engine room relay block.
    5. Connect the 2 ECM connectors and lower the 2 levers.
      NOTE:
      • When connecting the ECM connectors, make sure that dirt, water or other foreign matter does not contact the connecting parts of the ECM connectors.
      • Be sure to securely connect the ECM connectors.
      GTY774418Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  4. INSTALL AIR CLEANER CASE SUB-ASSEMBLY 
    1. Install the air cleaner case sub-assembly to the vehicle with the 2 bolts.

      Torque: 4.0 N*m (41 kgf*cm, 35 in.*lbf) 

    2. Install the air cleaner filter element sub-assembly to the air cleaner case sub-assembly.
  5. INSTALL NO. 1 AIR CLEANER INLET 

    Refer to PROCEDURE - STEP 23 [02/2017 - 10/2017] , or refer to PROCEDURE - STEP 24 [10/2017 - 05/2018] , or refer to PROCEDURE - STEP 25 [05/2018 - 09/2019] , or refer to PROCEDURE - STEP 26 [09/2019 - 12/2021]

  6. INSTALL RADIATOR COVER 

    Refer to PROCEDURE - STEP 4 [02/2017 - 10/2017] , or refer to PROCEDURE - STEP 4 [10/2017 - 09/2019] , or refer to PROCEDURE - STEP 4 [09/2019 - ]

  7. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE 

    See step  3 [02/2017 - 10/2017] See step  3 [10/2017 - 12/2021]

  8. INSTALL NO. 2 CYLINDER HEAD COVER 

    See step  4

  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Refer to PROCEDURE - STEP 2

    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Refer to INITIALIZATION [02/2017 - 10/2017] , or refer to INITIALIZATION [10/2017 - 05/2018] , or refer to INITIALIZATION [05/2018 - 09/2019] , or refer to INITIALIZATION [09/2019 - 08/2020]

  10. PERFORM INITIALIZATION 

    Refer to INITIALIZATION [02/2017 - 10/2017] , or refer to INITIALIZATION [10/2017 - 05/2018] , or refer to INITIALIZATION [05/2018 - 09/2019] , or refer to INITIALIZATION [09/2019 - 08/2020]