Installation [08/2015 - ]: Procedure
- INSTALL SKID CONTROL BUZZER ASSEMBLY
- INSTALL NO. 1 SWITCH HOLE BASE
Refer to PROCEDURE - Step 28
- INSTALL LOWER NO. 1 INSTRUMENT PANEL FINISH PANEL
Refer to PROCEDURE - Step 29
- INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUBASSEMBLY
Refer to PROCEDURE - Step 31
- INSTALL COWL SIDE TRIM BOARD LH
Refer to PROCEDURE - Step 30
- INSTALL FRONT DOOR SCUFF PLATE LH
Refer to PROCEDURE - Step 75 [08/2015 - 08/2017] Refer to PROCEDURE - Step 78 [08/2017 - 08/2019] Refer to PROCEDURE - Step 85 [08/2019 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [08/2015 - 08/2017] Refer to INITIALIZATION [08/2017 - ] ).