Installation [10/2019 - ]: Procedure
- INSTALL ENGINE STOP AND START ECU
- Install the engine stop and start ECU with the 2 nuts.
Nut (A) Nut (B) for nut (A)
Torque: 5.5 N.m (56 kgf/cm, 49 in.lbf)
for nut (B)
Torque: 8.0 N.m (82 kgf/cm, 71 in.lbf)
- Attach the clamp and connect the wire harness to the engine stop and start ECU.
- Connect the 3 connectors to the engine stop and start ECU.
- Install the engine stop and start solenoid filter.
See step 1
- Install the engine stop and start ECU with the 2 nuts.
- INSTALL LOWER NO. 1 INSTRUMENT PANEL AIRBAG ASSEMBLY
Refer to INSTALLATION [11/2018 - 08/2020] , or refer to INSTALLATION [08/2020 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [10/2019 - 06/2020] , or refer to INITIALIZATION [06/2020 - 08/2020] , or refer to INITIALIZATION [08/2020 - 12/2021] , or refer to INITIALIZATION [12/2021 - 10/2022] , or refer to INITIALIZATION [10/2022 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]
- PERFORM REGISTRATION
Refer to REGISTRATION [10/2019 - 12/2021] , or refer to REGISTRATION [12/2021 - 10/2022] , or refer to REGISTRATION [10/2022 - 10/2023] , or refer to REGISTRATION [10/2023 - ]