Installation [11/2021 - ]: Procedure
- INSTALL MASS AIR FLOW METER NOTE:
- When reusing the mass air flow meter, inspect the O-ring and perform the installation in a way that it will not be pinched or damaged.
- If the O-ring is damaged, replace the mass air flow meter with a new one.
Torque: 1.0 N*m (10 kgf*cm, 9 in.*lbf)
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 5 - INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
Refer to WORK PROCEDURE [11/2021 - ]
HINT:
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.