Installation [11/2021 - ]: Procedure
- INSTALL SPARK PLUG
Refer to INSTALLATION [11/2021 - ]
- INSTALL IGNITION COIL ASSEMBLY
Torque: 8.5 N*m (87 kgf*cm, 75 in.*lbf)
- INSTALL NO. 1 FUEL PIPE PROTECTOR LH (for Bank 2)
Refer to PROCEDURE - Step 14 - INSTALL FUEL TUBE PROTECTOR (for Bank 2)
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- INSTALL ECM (for Bank 1)
Refer to INSTALLATION [11/2021 - ] - INSTALL FRONT UPPER SUSPENSION TO COWL BRACE SUB-ASSEMBLY LH (for Bank 2)
Refer to PROCEDURE - Step 1
- INSTALL FRONT UPPER SUSPENSION TO COWL BRACE SUB-ASSEMBLY RH (for Bank 1)
- Perform the same procedure as for the LH side.
Refer to PROCEDURE - Step 1
- Perform the same procedure as for the LH side.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 5 - INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
Refer to WORK PROCEDURE [11/2021 - ]
HINT:
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.