Installation [03/2019 - ]: Procedure
- INSTALL ECM
- INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 38
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to INSTALLATION [03/2019 - ]
- ENCODE/PROGRAM CONTROL UNIT(S) NOTE:
- Use the most recent software version to prevent faults during programming/encoding.
- The battery voltage must not drop below 13.0 V during programming.
- Use only recommended chargers for a low-voltage vehicle electrical system.
- Do not exceed the maximum charging voltage of 14.8 V when charging the battery.
- When there is communication abnormality in the middle of work, control unit might be damaged.
- It may be necessary to perform the Action Plan several times.
- Connect the battery charger to the vehicle.
- Connect the diagnosis system with the vehicle.
- Determine the action plan.
Service plan / Programming plan / Action plan / Calculate action plan
- Accept and fully process the measures plan.
Service plan / Programming plan / Action plan / Perform action plan
- Wait until programming/encoding has been completed.NOTE:
When there is communication abnormality in the middle of work, control unit might be damaged.
- Carry out vehicle test.
Vehicle management / Troubleshooting / Fault memory / Calculate test plan
- Delete the fault memory.
Vehicle management / Troubleshooting / Fault memory / Delete fault memory
- Disconnect the diagnosis system from the vehicle.
- Disconnect the battery charger from the vehicle.
- PERFORM INITIALIZATION
- Connect the diagnosis system to the vehicle and enter the following menus:
Vehicle management / Service functions / Drive / Engine electronics / Reset adaptations / ABL Reset adaptation values
- Connect the diagnosis system to the vehicle and enter the following menus: