Hall Sending Unit Test (With Knock Control Unit)
- Perform Hall sending unit VOLTAGE SUPPLY CHECK (WITH KNOCK CONTROL UNIT) before proceeding. Turn ignition off. With 3-wire connector installed at distributor, move protective cover to gain access to rear of connector.
- Connect voltmeter across terminals No. 1 and 2 at rear of 3-wire connector. Remove coil high voltage lead and ground with jumper wire.
- Turn ignition switch to "START" position. Voltage should be indicated while starter is actuated.
- If voltmeter does not show voltage reading while cranking, replace Hall sending unit. If voltmeter shows voltage while cranking, check for same voltage readings at Hall Ignition Control Unit terminals No. 4 and 6 (2 and 6 on Volkswagen 16-valve).
- If readings are not identical, check wire harness from Hall sending unit to knock control unit and from knock control unit to Hall ignition control unit. See Fig 1.