LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Dodge and Ram >> 2021 >> Durango SXT Plus, AWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 17 ((Electronic Shift Module (ESM) - Electrical Diagnostics - 8HP95 Automatic Transmission)) >> DTC Troubleshooting >> U145D-00-Implausible Data Received From TCM On D-Pt >> Diagnostic-Test
April 5, 2026: LEMON Manuals is launched! Read the announcement.

U145D-00-Implausible Data Received From TCM On D-Pt: Diagnostic-Test

WARNING: This page is about a different variant/trim than selected.
  1. VERIFY THE DTC IS ACTIVE 
    NOTE:

    Make sure the battery voltage is between 10 and 16 volts before proceeding.

    1. With the scan tool, read active DTCs.

      Is this DTC active?

      Yes 

      • Go To  2

      No 

  2. VERIFY THE ESM IS ACTIVE ON THE BUS 
    1. Turn the ignition ON.
    2. With the scan tool, select Network Diagnostics.
    3. Verify the ESM is active on the BUS.

      Is the ESM active on the BUS?

      Yes 

      • Go To  3

      No 

      • Refer to  DIAGNOSIS AND TESTING  and perform the NO RESPONSE FROM ESM (ELECTRONIC SHIFT MODULE) diagnostic procedure.
  3. CYCLE IGNITION 
    1. Cycle the ignition from RUN to OFF three times ending with the key in the RUN position.

      Does the DTC become active?

      Yes 

      • Go To  4

      No 

      • The condition is not present at this time. Using the wiring diagram/schematic as a guide, inspect the wiring for chafed, pierced, pinched and partially broken wires and the wiring harness connectors for broken, bent, pushed out and corroded terminals.
      • Perform the ESM VERIFICATION TEST. Refer to ESM VERIFICATION TEST  .
  4. CHECK THE D-PT BUS (+) CIRCUIT FOR A SHORT TO VOLTAGE 
    1. Measure the voltage between the D-PT BUS (+) circuit at the ESM connector and ground.

      Is the voltage above 5.0 volts?

      Yes 

      • Repair the short to voltage in the D-PT BUS (+) circuit.
      • Perform the ESM VERIFICATION TEST. Refer to ESM VERIFICATION TEST  .

      No 

      • Go To  5
  5. CHECK THE D-PT BUS (-) CIRCUIT FOR A SHORT TO GROUND 
    1. Turn the ignition OFF.
    2. Measure the resistance between ground and the D-PT BUS (-) circuit at the ESM connector and ground.

      Is the resistance below 10K Ohms?

      Yes 

      • Repair the short to ground in the D-PT BUS (-) circuit.
      • Perform the ESM VERIFICATION TEST. Refer to ESM VERIFICATION TEST  .

      No 

      • Using the schematics as a guide, check the ESM terminals for corrosion, damage or terminal push out. Pay particular attention to all power and ground circuits. If no problems are found, replace the ESM in accordance to the Service Information. Refer to MODULE, ELECTRONIC SHIFT (ESM), REMOVAL .
      • Perform the ESM VERIFICATION TEST. Refer to ESM VERIFICATION TEST  .