Master Switch Test
Remove power window master switch. See MASTER POWER WINDOW SWITCH
under REMOVAL & INSTALLATION. Using an ohmmeter, check resistance of switch terminals with switch in indicated positions. If continuity is not as specified, replace switch. See Figure
. See POWER WINDOW MASTER SWITCH TEST table.
POWER WINDOW MASTER SWITCH TEST
| Position |
Main Switch |
Pin Continuity |
| Left Front Switch |
N/A |
* |
| Right Front Switch |
| Off |
On |
A1, A2 & B1 |
| Off |
Off |
A1 & A2 |
| Up |
On |
A1 & A9 |
| Up |
Off |
A1 & A9 |
| Down |
On |
A2 & A9 |
| Down |
Off |
A2 & A9 |
| Right Rear Switch |
| Off |
On |
A13, A14 & B1 |
| Off |
Off |
A13 & A14 |
| Up |
On |
A6 & A14 |
| Up |
Off |
A6 & A14 |
| Down |
On |
A6 & A13 |
| Down |
Off |
A6 & A13 |
| Left Rear Switch |
| Off |
On |
A7, A8 & B1 |
| Off |
Off |
A7 & A8 |
| Up |
On |
A8 & A12 |
| Up |
Off |
A8 & A12 |
| Down |
On |
A7 & A12 |
| Down |
Off |
A7 & A12 |