Pinpoint Test A : The Powertrain Control Module (Pcm) Does Not Respond To The Diagnostic Scan Tool
WARNING: This page is about a different car, the 2015 Lincoln MKZ. However, it is still accessible from the selected car via links, so may be relevant.
- A1 VERIFY WHETHER OTHER HS-CAN1 (HIGH SPEED-CONTROLLER AREA NETWORK 1) MODULES PASS THE NETWORK TEST
- Using a diagnostic scan tool, perform the network test.
Is the text "pass" or a DTC listed next to any of the following modules (if equipped): ACCM (HEV), APIM, BCM, BECM (HEV), DC/ DC Converter Control Module (HEV), Headlamp Control Module (HCM), SOBDMC/ TCM (HEV)?
Yes If "pass" or a DTC was listed next to the PCM, a network fault is not currently present. If "pass" or a DTC was listed next to one or more modules other than the PCM, GO to A2 No No modules are currently communicating on the HS-CAN1. GO to Pinpoint Test AO - A2 PC/ED (POWERTRAIN CONTROL/EMISSIONS DIAGNOSIS) MANUAL PINPOINT TEST QA VERIFICATION CHECK
- Verify PC/ED manual pinpoint test QA has been performed.
Has pinpoint test QA been performed?
Yes GO to A3 No Refer to Pinpoint Tests QA: Unable To Activate Self-Test/Network Communication Error . - A3 CHECK THE HS-CAN1 (HIGH SPEED-CONTROLLER AREA NETWORK 1) TERMINATION RESISTANCE
- Ignition OFF.
Is the resistance between 54 and 66 ohms?
Yes GO to A5 No GO to A4 - A4 CHECK THE HS-CAN1 (HIGH SPEED-CONTROLLER AREA NETWORK 1) CIRCUITS BETWEEN THE PCM (POWERTRAIN CONTROL MODULE) AND THE DLC (DATA LINK CONNECTOR) FOR AN OPEN
- Measure:
2.0L GTDI
Positive Lead Measurement / Action Negative Lead C1381B-69 C251-6 C1381B-68 C251-14 3.7L Duratec
Positive Lead Measurement / Action Negative Lead C175B-59 C251-6 C175B-58 C251-14 2.0L Hybrid
Positive Lead Measurement / Action Negative Lead C175B-59 C251-6 C175B-58 C251-14
Are the resistances less than 3 ohms?
Yes GO to A5 No REPAIR the circuit in question. - Measure:
- A5 CHECK FOR CORRECT PCM (POWERTRAIN CONTROL MODULE) OPERATION
- Ignition OFF.
- Disconnect and inspect all the PCM connectors.
- Repair:
- corrosion (install new connector or terminals - clean module pins)
- damaged or bent pins - install new terminals/pins
- pushed-out pins - install new pins as necessary
- Reconnect the PCM connectors. Make sure they seat and latch correctly.
- Operate the system and determine if the concern is still present.
Is the concern still present?
Yes CHECK OASIS for any applicable Technical Service Bulletins (TSBs). If a TSB exists for this concern, DISCONTINUE this test and FOLLOW TSB instructions. If no Technical Service Bulletins (TSBs) address this concern, INSTALL a new PCM. Refer to the appropriate Engine article for the procedure. No The system is operating correctly at this time. The concern may have been caused by module connections. ADDRESS the root cause of any connector or pin issues.