With GST
- Start engine and warm it up to the normal operating temperature.
- Turn ignition switch OFF and wait at least 10 seconds.
- Start engine and keep the engine speed between 3,500 and 4,000 RPM for at least 1 minute under no load.
- Let engine idle for 1 minute.
- Open engine hood.
- Set voltmeter probe between ECM terminals 74 [HO2S2 (bank 1) signal], 55 [HO2S2 (bank 2) signal] and ground.
- Keep engine speed at 2,500 RPM constant under no load.
- Make sure that the voltage does not vary for more than 5 seconds.
If the voltage fluctuation cycle takes less than 5 seconds, go to "DIAGNOSTIC PROCEDURE ".
Fig 1: Checking Voltage Between ECM Terminals 74 [HO2S2 (Bank 1) Signal], 55 [HO2S2 (Bank 2) Signal] And GroundCourtesy of NISSAN MOTOR CO., U.S.A.
- 1 cycle: 0.6 - 1.0 --> 0 - 0.3 --> 0.6 - 1.0