September 30: LEMON manuals is back up on a temporary server! Slowness is possible
Fuel Pump Control Module
Courtesy of NISSAN MOTOR CO., U.S.A.
- Start engine and warm it up to normal operating temperature.
- Turn ignition switch OFF and wait at least 10 seconds.
- Check voltage between FPCM terminal 4 and ground under the following conditions.
FPCM TERMINALS VOLTAGE SPECIFICATIONS CHART
| Condition |
Voltage |
| When engine cranking |
Approx. 0V |
| After starting engine |
Approx. 5V |
- If NG, replace fuel pump control module.
Courtesy of NISSAN MOTOR CO., U.S.A.