Removal and Installation: Installation
Installation is the reverse order of removal.
NOTE:
Locate the battery at the outside of the vehicle in the battery tray when installing the battery.
Check that the positive terminal cap opens and closes.
Check that the positive terminal cap opens and closes.
CAUTION:
When connecting, connect the battery cable to the positive terminal first.
Battery fix frame mounting nut
Torque Specifications : 4.4 N.m (0.45 kg-m, 39 in-lb)
Battery terminal nut
Torque Specifications : 5.4 N.m (0.55 kg-m, 48 in-lb)
NOTE:
Reset electronic systems as necessary. Refer to
"ADDITIONAL SERVICE WHEN REMOVING BATTERY NEGATIVE TERMINAL : REQUIRED PROCEDURE AFTER BATTERY DISCONNECTION
".