Removal and Installation: Installation
Installation is in the reverse order of removal.
- Install the generator and check the tension of the drive belt. Refer to
"CHECKING DRIVE BELTS
".CAUTION: Tighten terminal nut carefully.
Terminal nut: 10.8 N.m (1.1 kg-m, 8 ft-lb)