Overall Function Check
Use this procedure to check the overall function of the park/neutral position (PNP) signal circuit. During this check, a 1st trip DTC might not be confirmed.
WITH GST
- Turn ignition switch ON.
- Check voltage between ECM terminal 102 (PNP signal) and ground under the following conditions.VOLTAGE REFERENCE CHART
Condition (Gear position) Voltage (Known-good data) P or N position Approx. 0 Except the above position BATTERY VOLTAGE (11 - 14V) - If NG, go to "DIAGNOSIS PROCEDURE ".