Diagnosis Procedure
Regarding Wiring Diagram information, refer to "WIRING DIAGRAM - INTELLIGENT KEY SYSTEM/ENGINE START FUNCTION - ".
- PERFORM INITIALIZATION
Perform initialization with CONSULT-III. Re-register all mechanical keys.
For initialization and registration of mechanical key. Refer to CONSULT-III Operation Manual.
Can the system be initialized and can steering lock be released with re-registered mechanical key?
YES: Steering lock solenoid was unregistered.
NO: GO TO 2
- CHECK STEERING LOCK SOLENOID POWER SUPPLY-1
- Turn ignition switch OFF.
- Disconnect steering lock solenoid connector.
- Check voltage between steering lock solenoid harness connector and ground.TERMINAL VOLTAGE REFERENCE CHART
Terminals Voltage (V) (Approx.) (+) (-) Steering lock solenoid connector Terminal M15 1 Ground Battery voltage Courtesy of NISSAN MOTOR CO., U.S.A.
Is the inspection result normal?
YES: GO TO 3
NO: Repair or replace harness.
- CHECK STEERING LOCK SOLENOID GROUND CIRCUIT
Check continuity between steering lock solenoid harness connector and ground.
TERMINAL CONTINUITY REFERENCE CHARTTerminals Continuity (+) (-) Steering lock solenoid connector Terminal M15 4 Ground Yes Courtesy of NISSAN MOTOR CO., U.S.A.
Is the inspection result normal?
YES: GO TO 4
NO: Repair or replace harness.
- CHECK STEERING LOCK SOLENOID COMMUNICATION CIRCUITS
- Disconnect Intelligent Key unit connector.
- Check continuity between steering lock solenoid connector (A) M15 terminals 2, 3 and Intelligent Key unit connector (B) M70 terminals 1, 32.TERMINAL CONTINUITY REFERENCE CHART
Terminals Continuity Steering lock solenoid connector Terminal Intelligent Key unit connector Terminal M15 2 M70 1 Yes 3 32 - Check continuity between steering lock solenoid connector (A) M15 terminals 2, 3 and ground.Fig 3: Checking Continuity Between Steering Lock Solenoid Connector M15 And Intelligent Key Unit Connector M70 Terminals
Courtesy of NISSAN MOTOR CO., U.S.A.
TERMINAL CONTINUITY REFERENCE CHARTTerminals Continuity Steering lock solenoid connector Terminals M15 2 Ground No 3 Is the inspection result normal?
YES: GO TO 5
NO: Repair or replace harness.
- CHECK INTELLIGENT KEY UNIT POWER SUPPLY-2
- Connect Intelligent Key unit connector.
- Check voltage between Intelligent Key unit harness connector and ground.TERMINAL VOLTAGE REFERENCE CHART
Terminals Voltage (V) (Approx.) (+) (-) Intelligent Key unit connector Terminal M70 1 Ground 5 Courtesy of NISSAN MOTOR CO., U.S.A.
Is the inspection result normal?
YES: GO TO 6
NO: Replace Intelligent Key unit. Refer to "REMOVAL AND INSTALLATION ".
- CHECK STEERING LOCK SOLENOID COMMUNICATION CIRCUIT
- Connect steering lock solenoid connector.
- Using an oscilloscope, check voltage between Intelligent Key unit connector and ground.
Courtesy of NISSAN MOTOR CO., U.S.A.NISSAN MOTOR CO., U.S.A.NISSAN MOTOR CO., U.S.A.
TERMINAL VOLTAGE REFERENCE CHARTTerminals Condition Voltage (V) (Approx.) (+) (-) Intelligent Key unit connector Terminal M70 32 Ground Steering lock Ignition knob is pushed LOCK status 5 LOCK <=> UNLOCK For 15 seconds after UNLOCK 5 15 seconds later UNLOCK 0 Is the inspection result normal?
YES: Replace Steering lock solenoid.
NO: Replace Intelligent Key unit. Refer to "REMOVAL AND INSTALLATION ".