BCM : Diagnosis Procedure
WARNING: This page is about a different car, the 2010 Nissan Armada. However, it is still accessible from the selected car via links, so may be relevant.
Regarding Wiring Diagram information, refer to "WIRING DIAGRAM ".
- CHECK FUSES AND FUSIBLE LINK
Check that the following fuses and fusible link are not blown.
TERMINAL REFERENCE CHARTTerminal No. Signal name Fuses and fusible link No. 57 Battery power supply 22 (15A) 70 F (50A) 11 Ignition ACC or ON 4 (10A) 38 Ignition ON or START 59 (10A) Is the fuse blown?
YES: Replace the blown fuse or fusible link after repairing the affected circuit.
NO: GO TO 2
- CHECK POWER SUPPLY CIRCUIT
- Turn ignition switch OFF.
- Disconnect BCM.
- Check voltage between BCM harness connector and ground.TERMINAL VOLTAGE REFERENCE CHART
Connector Terminals Power source Condition Voltage (V) (Approx.) (+) (-) M18 11 Ground ACC power supply Ignition switch ACC or ON Battery voltage 38 Ground Ignition power supply Ignition switch ON or START Battery voltage M20 57 Ground Battery power supply Ignition switch OFF Battery voltage 70 Ground Battery power supply Ignition switch OFF Battery voltage Courtesy of NISSAN MOTOR CO., U.S.A.
Is the measurement value normal?
YES: GO TO 3
NO: Repair or replace harness.
- CHECK GROUND CIRCUIT
Check continuity between BCM harness connector and ground.
TERMINAL CONTINUITY REFERENCE CHARTBCM Ground Continuity Connector Terminal M20 67 Yes Courtesy of NISSAN MOTOR CO., U.S.A.
Does continuity exist?
YES: Inspection End.
NO: Repair or replace harness.