Diagnosis Procedure
WARNING: This page is about a different car, the 2011 Nissan Juke. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK PUSH-BUTTON IGNITION SWITCH POWER SUPPLY CIRCUIT
- Turn ignition switch OFF.
- Disconnect push-button ignition switch connector.
- Check voltage between push-button ignition switch harness connector and ground.CONNECTOR TERMINALS VOLTAGE REFERENCE CHART
(+) (-) Voltage (V) (Approx.) Push-button ignition switch Connector Terminal M101 8 Ground 12 Is the inspection result normal?
YES: GO TO 2.
NO: GO TO 3.
- CHECK PUSH-BUTTON IGNITION SWITCH CIRCUIT 1
- Disconnect IPDM E/R connector.
- Check continuity between push-button ignition switch harness connector and IPDM E/R harness connector.CONNECTOR TERMINALS CONTINUITY REFERENCE CHART
Push-button ignition switch IPDM E/R Continuity Connector Terminal Connector Terminal M101 8 E17 66 Existed - Check continuity between push-button ignition switch harness connector and ground.CONNECTOR TERMINALS CONTINUITY REFERENCE CHART
Push-button ignition switch Ground Continuity Connector Terminal M101 8 Not existed Is the inspection result normal?
YES: Replace IPDM E/R. Refer to "REMOVAL AND INSTALLATION ".
NO: Repair harness or connector.
- CHECK PUSH-BUTTON IGNITION SWITCH CIRCUIT 2
- Disconnect BCM connector.
- Check continuity between push-button ignition switch harness connector and BCM harness connector.CONNECTOR TERMINALS CONTINUITY REFERENCE CHART
Push-button ignition switch BCM Continuity Connector Terminal Connector Terminal M101 8 M70 76 Existed - Check continuity between push-button ignition switch harness connector and ground.CONNECTOR TERMINALS CONTINUITY REFERENCE CHART
Push-button ignition switch Ground Continuity Connector Terminal M101 8 Not existed Is the inspection result normal?
YES: GO TO 4.
NO: Repair harness or connector.
- REPLACE BCM
- Replace BCM. Refer to "REMOVAL AND INSTALLATION ".
- Perform initialization of BCM and registration of all Intelligent Keys using CONSULT-III.
For initialization and registration procedures, refer to CONSULT-III Operation Manual NATS-IVIS/NVIS.
INSPECTION END