Diagnosis Procedure
WARNING: This page is about a different car, the 2011 Nissan Juke. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK FUSE
- CHECK SECURITY INDICATOR LAMP POWER SUPPLY CIRCUIT
- Disconnect combination meter connector.
- Check voltage between combination meter harness connector and ground.CONNECTOR TERMINALS VOLTAGE REFERENCE CHART
(+) (-) Voltage (V) (Approx.) Combination meter Connector Terminal M34 27 Ground Battery voltage Is the inspection result normal?
YES: GO TO 3.
NO: Repair or replace harness.
- CHECK SECURITY INDICATOR LAMP SIGNAL
- Connect combination meter connector.
- Disconnect BCM connector.
- Check voltage between BCM harness connector and ground.CONNECTOR TERMINALS VOLTAGE REFERENCE CHART
(+) (-) Voltage (V) (Approx.) BCM Connector Terminal M68 23 Ground Battery voltage Is the inspection result normal?
YES: GO TO 4.
NO: GO TO 5.
- REPLACE BCM
- Replace BCM. Refer to "REMOVAL AND INSTALLATION ".
- Perform initialization of BCM and registration of all Intelligent Keys using CONSULT-III.
For initialization and registration procedures, refer to CONSULT-III Operation Manual NATS-IVIS/NVIS.
INSPECTION END
- CHECK SECURITY INDICATOR LAMP CIRCUIT
- Disconnect combination meter connector.
- Check continuity between combination meter harness connector and BCM harness connector.CONNECTOR TERMINALS CONTINUITY REFERENCE CHART
Combination meter BCM Continuity Connector Terminal Connector Terminal M34 18 M68 23 Existed - Check continuity between combination meter harness connector and ground.CONNECTOR TERMINALS CONTINUITY REFERENCE CHART
Combination meter Ground Continuity Connector Terminal M34 18 Not existed Is the inspection result normal?
YES: Replace combination meter. Refer to "REMOVAL AND INSTALLATION ".
NO: Repair or replace harness.