IPDM E/R (INTELLIGENT POWER DISTRIBUTION MODULE ENGINE ROOM): Diagnosis Procedure
- CHECK FUSES AND FUSIBLE LINK
Check that the following IPDM E/R fuses or fusible links are not blown.
Signal name Fuses and fusible link No. Battery power supply C 50 51 Is the fuse fusing?
YES: Replace the blown fuse or fusible link after repairing the affected circuit if a fuse or fusible link is blown.
NO: GO TO 2.
- CHECK POWER SUPPLY CIRCUIT
- CHECK GROUND CIRCUIT
Check continuity between IPDM E/R harness connectors and ground.
IPDM E/R Ground Continuity Connector Terminal E5 12 Existed E6 41 Does continuity exist?
YES: INSPECTION END
NO: Repair harness or connector.