LI-ION BATTERY CONTROLLER: Disassembly and Assembly: Assembly

WARNING: This page is about a different car, the 2011 Nissan Leaf. However, it is still accessible from the selected car via links, so may be relevant.

Assemble in the reverse order of disassembly.

  1. Install Li-ion battery controller.
    WARNING: To prevent shock hazards, be sure to put on insulated protective gear and use insulated tools.
  2. Follow the procedure below and install battery pack upper case.
    1. Tighten mounting nuts and bolts in numerical order as shown in the figure.
      Fig 1: Tightening Order Of Battery Pack Upper Case Mounting Nuts And Bolts
      G07084321Courtesy of NISSAN MOTOR CO., U.S.A.
      WARNING: To prevent shock hazards, be sure to wear protective gear.
    2. Install ground bolt (A).
      Fig 2: Identifying Ground Bolts
      G07084322Courtesy of NISSAN MOTOR CO., U.S.A.
      WARNING: To prevent shock hazards, be sure to wear protective gear.
  3. Install service plug retainer.
    WARNING: To prevent shock hazards, be sure to wear protective gear.
    CAUTION:
    • Perform the "ADDITIONAL SERVICE WHEN REPLACING LI-ION BATTERY CONTROLLER" when Li-ion battery controller is replaced. Refer to "WORK PROCEDURE ".
    • Check the following items after installing battery pack: Refer to "LI-ION BATTERY CONTROLLER: INSPECTION ".
    • AIRTIGHTNESS TEST 
    • ELECTRIC EQUIPOTENTIAL TEST