LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Infiniti >> 2012 >> G37 Base, 2D Convertible >> Repair and Diagnosis >> External Pages >> Different car >> Section 234 (Security Control System -- G37 Convertible) >> System Description >> Intelligent Key System/Engine Start Function >> System Description >> Power Supply Position Change Table By Push-Button Ignition Switch Operation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Power Supply Position Change Table By Push-Button Ignition Switch Operation

WARNING: This page is about a different car, the 2011 Infiniti G37. However, it is still accessible from the selected car via links, so may be relevant.

The power supply position changing operation can be performed with the following operations.

NOTE:
  • When an Intelligent Key is within the detection area of inside key antenna and when it is inserted to the key slot, it is equivalent to the operations below.
  • When starting the engine, the BCM monitors under the engine start conditions,

A/T models 

M/T models 

Vehicle speed: less than 4 km/h (2.5 MPH)

POWER SUPPLY POSITION CHANGE CHART

Power supply position Engine start/stop condition Push-button ignition switch operation frequency
A/T models M/T models
Selector lever position Brake pedal operation condition Clutch pedal operation condition
LOCK → ACC - Not depressed Not depressed 1
LOCK → ACC → ON - Not depressed Not depressed 2
LOCK → ACC → ON → OFF - Not depressed Not depressed 3
LOCK → START
ACC → START
ON → START
P or N position Depressed Depressed 1
Engine is running → OFF - - - 1

Vehicle speed: 4 km/h (2.5 MPH) or more

POWER SUPPLY POSITION CHANGE CHART

Power supply position Engine start/stop condition Push-button ignition switch operation frequency
A/T models M/T models
Selector lever position Brake pedal operation condition Clutch pedal operation condition
Engine is running → ACC - - - Emergency stop operation
Engine stall return operation while driving N position Not depressed Depressed 1

Emergency stop operation