Work Procedure
- AROUND VIEW MONITOR CONTROL UNIT CONFIGURATION
Perform the around view monitor control unit configuration with CONSULT. Refer to WORK PROCEDURE .
GO TO STEP 2.
- AROUND VIEW MONITOR CONTROL UNIT CALIBRATION
Perform the around view monitor calibration with CONSULT. Refer to DESCRIPTION .
GO TO STEP 3.
- PREDICTIVE COURSE LINE CENTER POSITION ADJUSTMENT
Perform the predictive course line center position adjustment. Refer to DESCRIPTION .
GO TO STEP 4.
- PERFORM SELF-DIAGNOSIS
- Perform the self-diagnosis of around view monitor control unit with CONSULT (AVM).
- Check if any DTC is detected.
Is any DTC detected?
YES
Perform the trouble diagnosis for the detected DTC. Refer to DTC INDEX .
NO
WORK END