LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2012 >> Grand Cherokee 4WD SRT-8 V8-6.4L >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Variable Valve Timing Solenoid >> Service and Repair >> Oil Intake Control Valve - Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Oil Intake Control Valve - Installation





INSTALLATION





1. Lubricate the oil control valve (OCV) rubber O-ring seal with clean engine oil.
2. Install the OCV and rotate into position.





3. Install the OCV (3) retaining bolt (2) and tighten to 11 Nm (8 ft. lbs.).
4. Connect OCV electrical connector (1).
5. Install intake manifold Intake Manifold - Removal.