Inspection Procedure
WARNING: This page is about a different car, the 2004 Lexus GS 430 and 2004 Lexus GS 300. However, it is still accessible from the selected car via links, so may be relevant.
- Check voltage between terminals CCS of ECM connector and body ground.
PREPARATION:
- Remove the ECM with connector still connected.
- Turn the ignition switch to ON.
CHECK:
Measure voltage between terminals CCS of ECM connector and body ground, when each of the SET/COAST, RESUME/ACCEL and CANCEL is turned ON.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
- NG: Proceed to next circuit inspection shown in problem symptoms table (See PROBLEM SYMPTOMS TABLE ).
- OK: Go to Next Step
- Check control switch continuity.
PREPARATION:
- Remove the steering wheel pad (See REMOVAL ).
- Disconnect the control switch connector.
CHECK:
Measure the resistance between terminals 4 and 5 of control switch connector when control switch is operated.
- NG: Replace control switch.
- OK: Go to Next Step
- Check main switch continuity.
PREPARATION:
- Remove the steering wheel pad (See REMOVAL ).
- Disconnect the control switch connector.
CHECK:
Check the continuity between terminals 4 and 5 of control switch connector when main switch is held ON and OFF.
OK:
- NG: Replace control switch.
- OK: Go to Next Step
- Check harness and connector between ECM and cruise control switch, cruise control switch and body ground (See
O/D DIRECT CLUTCH SPEED SENSOR
).
- NG: Repair or replace harness or connector.
- OK: Go to Next Step
- Check cruise control indicator light (See
COMBINATION METER
).
- NG: Replace combination meter.
- OK: Go to next step.
Check and replace ECM (See O/D DIRECT CLUTCH SPEED SENSOR ).