Inspection Procedure
- Check fuse. (GAUGE, MPX-B2 and DOME fuse)
- NG: Replace fuse.
- OK: Go to next step.
- Check voltage between terminals 12(B), 13(B), 1(IG+) and 11(ES) of combination meter connector.
- PREPARATION:
- Remove the combination meter.
- Disconnect the combination meter connector.
- CHECK:
Measure voltage between terminals 12(B), 13(B), and 1(IG+) of the combination meter connector and 11(ES).
- OK: Voltage: 10-14 V
- OK: Proceed to next circuit inspection shown on problem symptom table (See PROBLEM SYMPTOMS TABLES ).
- NG: Go to next step.
- PREPARATION:
- Check for open in harness and connector between terminal GND of combination meter and body ground.
- NG: Repair or replace wire harness or connector.
- OK: Check and repair wire harness and connector between combination meter and battery.