Light Control Rheostat: Installation
- INSTALL LIGHT CONTROL RHEOSTAT
- Engage the 2 claws and install the light control rheostat.
- INSTALL NO. 1 SWITCH HOLE BASE
- Connect each connector.
- Engage the 4 clips and install the No. 1 switch hole base.
- INSTALL LOWER INSTRUMENT PANEL SUB-ASSEMBLY (See INSTALLATION )
- INSTALL INSTRUMENT PANEL FINISH PANEL END LH (See INSTALLATION )
- INSTALL SIDE INSTRUMENT PANEL LH (See INSTALLATION )
- INSTALL FRONT DOOR OPENING TRIM COVER LH (See INSTALLATION )
- INSTALL FRONT DOOR SCUFF PLATE LH (See INSTALLATION )