Engine Control System (2GR-FSE) - System And Circuit Testing, On-Vehicle Inspection, Removal, Inspection, Installation: ECM: Removal
- DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL CAUTION: Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to prevent airbag and seat belt pretensioner activation.
- REMOVE COOL AIR INTAKE DUCT SEAL (See REMOVAL )
- REMOVE ENGINE ROOM SIDE COVER LH (See REMOVAL )
- REMOVE ECM BOX COVER
- Remove the 3 bolts and cover.NOTE:
- Remove all water on and around the cover.
- Perform the inspection indoors to avoid rain.
- Be sure to prevent water intrusion to the ECM (connectors and screw parts).
- Remove the 3 bolts and cover.
- DISCONNECT WIRE HARNESS
- Using a screw driver, detach the 2 claws.
HINT:
Tape the screwdriver tip before use.
- Disconnect the 2 connector holders.
- Disconnect the 6 connectors.
- Using a screw driver, detach the 2 claws.
- REMOVE ECM
- Remove the 2 nuts and ECM.