LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 2019 >> Eclipse Cross ES, AWD >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Continuously Variable Transaxle (CVT) (With Diagnostics) >> Oil Pan And Valve Body Assembly >> Removal And Installation >> Installation Service Points >> >>B<< Valve Body Assembly Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

>>B<< Valve Body Assembly Installation

Install the control valve assembly on the transaxle case as follows.

  1. Install the valve body harness on the control valve assembly.
    CAUTION:
    • Push in the valve body harness until the detent contacts the transaxle case.
    • Be careful not to cause damage to the terminal body.
    G10230084Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
  2. Install the terminal body on the transaxle case, while aligning the detent of terminal body with the transaxle case as shown in the illustration.
    G10230085Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
    G10230086Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
  3. Slide the control valve assembly from the left side, and install it on the transaxle case.
    G10230082Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
  4. Install the fastening bolts of control valve assembly, and tighten to the specified torque of 7.9 N.m (70 in-lb).
    Bolt symbol A B C
    Shank length mm (inch) 54 (2.1) 44 (1.7) 54 (2.1)
    Quantity 8 1 2
    G10230088Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.