Diagnostic Procedure
WARNING: This page is about a different car, the 2003 Nissan Murano. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK INPUT SIGNALS
With CONSULT-II
- Start engine.
- Select ECU INPUT SIGNALS in DATA MONITOR mode for TRANSMISSION with CONSULT-II.
- Start vehicle and read out the value of PRI SPEED SEN.
OK or NG
- OK: GO TO 6.
- NG: GO TO 2.
- CHECK INPUT SPEED SENSOR (PRIMARY SPEED SENSOR)
- Start engine.
- Check voltage between TCM connector terminals 46 (L/O) and 42 (W/R).
- Check the pulse with CONSULT-II or oscilloscope. When vehicle cruises.
OK or NG
- OK: GO TO 6.
- NG: Battery voltage is not supplied: GO TO 3.
- NG: Battery voltage is supplied, but there is a malfunction in the frequency: GO TO 4.
- CHECK THE HARNESS BETWEEN TCM AND CVT UNIT HARNESS CONNECTOR (SENSOR POWER AND SENSOR GROUND)
- Turn ignition switch OFF.
- Disconnect the TCM connector and CVT unit harness connector.
- Check continuity between TCM connector and CVT unit harness connector.
Courtesy of NISSAN MOTOR CO., U.S.A.
- If OK, check harness for short to ground and short power.
- Reinstall any part removed.
OK or NG
- OK: GO TO 6.
- NG: Repair open circuit or short to ground or short to power in harness or connectors.
- CHECK THE HARNESS BETWEEN TCM AND CVT UNIT HARNESS CONNECTOR [INPUT SPEED SENSOR (PRIMARY SPEED SENSOR)]
- Turn ignition switch OFF.
- Disconnect the TCM connector and CVT unit harness connector.
- Check continuity between TCM connector and CVT unit harness connector.
- If OK, check harness for short to ground and short power.
- Reinstall any part removed.
OK or NG
- OK: GO TO 5.
- NG: Repair open circuit or short to ground or short to power in harness or connectors.
- CHECK THE TCM SHORT
- Replace same type TCM, perform self-diagnosis. Erase self-diag result and them drive the vehicle [10km/h (6MPH) or more], perform self-diagnosis. Refer to DTC CONFIRMATION PROCEDURE .
- Is the IN PY SPD SEN/CIR detected again?
Yes or No
- YES: Replace the transaxle assembly. Refer to REMOVAL AND INSTALLATION .
- NO: Replace the TCM. Refer to PRECAUTIONS FOR CVT ASSEMBLY REPLACEMENT .
- CHECK DTC
Perform DTC Confirmation Procedure. Refer to DTC CONFIRMATION PROCEDURE .
OK or NG
- OK: INSPECTION END .
- NG: GO TO 7.
- PERFORM TCM INSPECTION
- Perform TCM input/output signal inspection.
- If NG, re-check TCM pin terminals for damage or loose connection with harness connector.
OK or NG
- OK: INSPECTION END .
- NG: Repair or replace damaged parts.