LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2010 >> Rogue SL, FWD >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System (MEXICO) >> DTC/Circuit Diagnosis >> Ignition Signal >> Component Function Check
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Component Function Check

  1. INSPECTION START

    Turn ignition switch OFF, and restart engine.

    Does the engine start? 

    YES-1: With CONSULT-III: GO TO 2.

    YES-2: Without CONSULT-III: GO TO  3.

    NO: Go to , "DIAGNOSIS PROCEDURE ".

  2. IGNITION SIGNAL FUNCTION

    With CONSULT-III 

    1. Perform "POWER BALANCE" in "ACTIVE TEST" mode with CONSULT-III.
    2. Check that each circuit produces a momentary engine speed drop.

    Is the inspection result normal? 

    YES: INSPECTION END

    NO: Go to , "DIAGNOSIS PROCEDURE ".

  3. IGNITION SIGNAL FUNCTION

    Without CONSULT-III 

    1. Let engine idle.
    2. Read the voltage signal between ECM harness connector and ground.
    VOLTAGE SPECIFICATION

    ECM Ground Voltage signal
    Connector Terminal
    F7 9 Ground
    G06055917Courtesy of NISSAN MOTOR CO., U.S.A.
    10
    11
    21
    NOTE: The pulse cycle changes depending on RPM at idle.

    Is the inspection result normal? 

    YES: INSPECTION END

    NO: Go to , "DIAGNOSIS PROCEDURE ".