LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2020 >> Altima S, AWD >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Control System (Pr25DD) (2 Of 2) >> Removal And Installation >> Electric Intake Valve Timing Control Module >> ELECTRIC INTAKE VALVE TIMING CONTROL MODULE : Removal & Installation >> Removal
April 5, 2026: LEMON Manuals is launched! Read the announcement.

ELECTRIC INTAKE VALVE TIMING CONTROL MODULE : Removal & Installation: Removal

  1. Disconnect negative and positive battery terminals, then wait at least three minutes. Refer to BATTERY DISCONNECT : Removal & Installation .
  2. Remove the engine side cover (LH). Refer to FENDER PROTECTOR : Exploded View .
  3. Partially remove the fender protector (LH). Refer to FENDER PROTECTOR : Exploded View .
  4. Remove the air cleaner resonator. Refer to AIR CLEANER AND AIR DUCT : Removal & Installation .
  5. Disconnect the harness connector from the electric intake valve timing control module.
  6. Remove the electric intake valve timing control module nuts.
  7. Remove the electric intake valve timing control module.