Work Procedure
- CHECK BATTERY TERMINALS CONNECTION
Check if battery terminals are clean and tight.
Is the inspection result normal?
YES
GO TO 2.
NO
Repair battery terminals connection. Confirm repair by performing system test using 165-DSS-5000P. Refer to the applicable instruction manual for proper testing procedures.
- CHECK FUSE AND FUSIBLE LINK
Check for blown fuse and fusible link.
Unit
Power source (Power supply terminals)
Fuse or Fusible Link
Capacity
Generator
Battery (fusible link box F4)
A
450 A
Combination meter
Ignition switch ON or START (fuse box J/B)
33
5 A
Battery (fuse box J/B)
20
10 A
Is the fuse or fusible link blown?
YES
Replace the blown fuse or fusible link after repairing the affected circuit.
NO
GO TO 3.
- CHECK GENERATOR GROUND TERMINAL CONNECTION
Check if generator is mounted to engine clean and tight.
Is the inspection result normal?
YES
GO TO 4.
NO
Repair connection.
- CHECK DRIVE BELT TENSION
Check drive belt tension. Refer to Inspection (with PR25DD engine) or Inspection (with KR20DDET engine).
Is the inspection result normal?
YES
Inspection End.
NO
Repair as needed.