Installation Procedure
- Install the muffler to the hangers.
- With the aid of an assistant, install the muffler insulators to the hangers.
- Install the exhaust pipe to muffler nuts, if equipped with a 3.9L with RPO MT2. Tighten:
Tighten the nuts to 30 N.m (22 lb ft).NOTE: Refer to Fastener Notice .
- Install the right catalytic converter to muffler nuts. Tighten: Tighten the nuts to 30 N.m (22 lb ft).
- Lower the vehicle.